Sometimes you need to get everyone in the same room!
A cool story about one of our projects: we were brought on-board at the tail end of this project during the construction period and were to perform functional testing and verification services. As soon as we got started on the project and began reviewing the design documents and proposed sequence of operations we started having concerns with the way that the design sequences were written for the geothermal heat recovery chiller system. We brought these concerns up to the Engi